Bituminous specialists
Szyb Walenty 18, 41-700 Ruda Śląska, Polandkontakt@emulking.pl
MIXBUD SBS DUZS · Photos: 12

Paving work and the joint detail

This series places MIXBUD SBS DUZS in the context of paving work: product packaging on site, the paver and rollers at work, and views of the connection between adjacent pavement lanes.

Photographs from site
The paver working along the edge of the adjacent lane.

Photographs from site

Enlarge photograph

MIXBUD packaging beside the joint and ongoing works.
01MIXBUD packaging beside the joint and ongoing works.
EMUL-KING on site during road construction.
02EMUL-KING on site during road construction.
The paver working along the edge of the adjacent lane.
03The paver working along the edge of the adjacent lane.
A close view of the lane connection beside the paver.
04A close view of the lane connection beside the paver.
The joint along the edge of the layer being laid.
05The joint along the edge of the layer being laid.
The edge of the new layer and its connection to the adjacent pavement.
06The edge of the new layer and its connection to the adjacent pavement.
Rollers at work beside the connection between adjacent lanes.
07Rollers at work beside the connection between adjacent lanes.
The joint in the context of ongoing compaction work.
08The joint in the context of ongoing compaction work.
Detail of the connection line between adjacent pavement lanes.
09Detail of the connection line between adjacent pavement lanes.
A close view of the edge and joint line.
10A close view of the edge and joint line.
A view along the connection during rolling.
11A view along the connection during rolling.
The connection line along the section under construction.
12The connection line along the section under construction.

Explore another application